Pipe rehabilitation work - List of Manufacturers, Suppliers, Companies and Products

Pipe rehabilitation work Product List

1~2 item / All 2 items

Displayed results

Pipe Lining System for Rehabilitation Works

We will resolve water pipe troubles such as red water, rust, and poor water flow!

The "Pipe Lining System" is a pipe rehabilitation construction that removes rust and scale inside pipes through careful investigation and diagnosis, using high-speed air flow and abrasives for removal, polishing, and cleaning. With our water supply pipe rehabilitation technology "NPB-2 Method" and "NPL-3 Method," we ensure peace of mind for a long time with short construction periods. By performing lining twice, we restore clean water. 【Features】 ■ Elimination of red water, rust, and leaks ■ Peace of mind for a long time with short construction periods ■ Reliable methods that are "fast!," "affordable!," "strong!," and "long-lasting!" *For more details, please download the PDF or feel free to contact us.

  • Water Supply Facilities
  • Piping and insulation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hot Water Pipe Rehabilitation Work "HSC Method"

10-year leak warranty! Hot water pipe rehabilitation work using antibacterial paint (antibacterial epoxy resin).

The "HSC Method (Hot Super Coat Method)" is a rehabilitation construction for hot water pipes that uses a uniquely developed antibacterial coating material. It meets the strict water quality standards set by the Ministry of Health, Labour and Welfare, allowing for hygienic hot water pipe lining that takes safety and security into consideration. The construction is completed in one day, and water quality confirmation is conducted the following day to conclude the process. This short construction period reduces the burden on residents. 【Features】 ■ Costs about half of replacing with new pipes ■ Reliable 10-year warranty ■ Meets the strict water quality standards set by the Ministry of Health, Labour and Welfare ■ Uses antibacterial coating (antibacterial epoxy resin) ■ Construction is completed in one day *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration